McArthur River Mine Airport

April 2007 Mc Arthur River Mine Airport - Design and construct complete airfield lighting system, 

This was truly a very exiting project to be involved with. Xstrata wanted to construct a 2500metre x30 metre runway capable of taking 737's  in twelve weeks.

Airport Electrical played a cruitial role in this project and achieved commissioning on time.

This was a  Design and Construct project and included.

Installation of a dual pit and duct system

Installation of interleaved MIRL runway and taxiway lighting

Installation of double sided PAPI and Aerodrome Beacon

Installation of airfield lighting control system and Constant Current Regulators and Pilot Activated Lighting (PAL)

Installation of Generator for Standby Power

Commissioning to MOS 139