November 2014 Murray Bridge Airport (Pallamanna) - Installation of new Automatic Weather Station BOM
Airport Electrical was commissioned by the Bureau of Meteorology to install a new power supply across the runway to the BOM site and to install new foundations for a Visibility meter and Ceilometer.
A new distribution board was installed in the Anemometer mast and modifications were made to the equipment power supply.